We’ll design it, build it, and make it sustainable. Fill out this form and we’ll get right back to you with brochures, prices and how to get started!
0421 348 105
Wangara, WA, 6065
Monday – Saturday
8.am to 6.pm
dean@allstylebuild.com.au
Absolutely not, we can modify one of our floor plans to suit your requirements, or custom design a floor plan from the beginning.
Granny flat approval can take as little as 10 days, construction of your granny flat can take as little as 6 weeks depending of your granny flat design and size. The Average time for the entire process beginning to end is generally 10-12 weeks – environmental factors permitting.
The maximum floor size that your granny flat can be built is 60M2. Maximum heights are governed by local councils and cannot be adjusted.
The answer is predominantly yes. There may be some restrictions which may apply to your block, but otherwise Granny flats are easily passed through local council providing you meet the requirements.
Minimum nominal size your Block needs to be if you’re thinking about building a granny flat is 450M2.
We build approximately 200 granny flats every year.
Wangara, Western Australia, 6065
0421 348 105
dean@allstylebuild.com.au
Allstyle Build is a member of the HIA
We’re a family owned and operated business in Perth, drawing on extensive experience in the building industry.